No. 03New Builds

New Construction

From an empty lot to a finished home.

Newly built craftsman home exterior with a deep front porch
No. 01Overview

The scope, plainly.

Building new is a different animal from remodeling. The schedule is longer, the coordination heavier, and the decisions earlier. We bring a clear, weekly cadence: a master schedule everyone works from, a fixed list of allowances, and weekly owner meetings to keep selections ahead of the build. We work with your architect or recommend one of several we've collaborated with for years. Most of our new builds are completed in nine to fourteen months from groundbreaking, depending on size, lot conditions, and finish complexity.

  • Architect coordination from concept through CDs
  • Energy-code-compliant envelope and mechanical design
  • Fixed allowance schedules with no surprises
  • Weekly progress meetings and a public schedule
No. 02How we work

Four phases, one crew.

  1. № 01

    Pre-construction

    Permit review, value engineering, and a master schedule before mobilization.

  2. № 02

    Site + foundation

    Excavation, drainage, foundation, and a clean utility tie-in.

  3. № 03

    Vertical

    Framing, weather barrier, MEP rough-in, and exterior cladding.

  4. № 04

    Finish

    Trim, cabinetry, stone, tile, paint, fixtures, and final inspections.

Start your new builds

Ready to talk about new builds?

A site walk is the fastest way to find out if we're a fit. Free, no obligation, usually within the week.