Whole-Home Renovations

When the house is good but the inside needs to start over.

Whole-home renovation in progress — interior with bright daylight
No. 01Overview

The scope, plainly.

A whole-home renovation is a months-long commitment that touches every system in the house. The right time to do one is rarely obvious — usually it's a combination of failing systems, an aging kitchen, and a layout that no longer fits how a family lives. We approach these projects with a clean pre-construction phase: a documented existing-conditions survey, a master schedule, and a fixed allowance package. From there, the work is methodical — demo, MEP, envelope, drywall, finish, and a careful closeout.

  • Down-to-the-studs interior renovations
  • Full electrical, plumbing, and HVAC replacement
  • Envelope and insulation upgrades to current code
  • Move-back coordination and final cleaning
No. 02How we work

Four phases, one crew.

  1. № 01

    Pre-construction

    Existing-conditions documentation, scope freeze, and a fixed allowance schedule.

  2. № 02

    Demo + systems

    Strategic demo, MEP rough-in, and envelope upgrades documented with photos.

  3. № 03

    Finish

    Cabinetry, stone, tile, trim, and paint coordinated under a single project manager.

  4. № 04

    Closeout

    Punch list, warranty walk, and a 90-day check-in.